Screening ng kapaligiran (ESS) pagsubok
The objective of the ESS test is to eliminate early death parts (including structural, materyal, pagmamanupaktura, shipping, and storage defects) as early as possible before they are assembled into the product to avoid the cost of midproduction impacting timetables and failure during the mission.
Stabilization Bake 1. Stabilization Bake
Based on MIL – STD – 883 Method 1008, Condition C rules, the electronic components into constant temperature box, the rated storage temperature, the temperature rise to parts for 24 hours of baking, this test does not need special design, mainly in the temperature and time, and pay attention to the heat source may not be directly radiation to the parts (through the fan power waft), all parts have any defect damage is not to test.
2. Temperature Cycling
Based on MIL – STD – 883 Method 1010, Condition B, halimbawa na lang, the electronic components into incubator, the temperature down to parts rated temperature storage place for 10 mga minuto, and then back to the room temperature at least 5 mga minuto, and then to part the rated storage temperature for at least ten minutes, so at least 10, its purpose in the test parts in high and low temperature changes, withstand the material properties, such as unbearable parts will be available by the seal test (including coarse leakage, leakage test) tested.
3. Constant Acceleration, Centrifuge
According to MIL-STD-883 and Method 2001 (the transistor and diode can be according to MIL-STD-750), the electronic components are placed in the centrifuge in the specified direction, and the electronic components are accelerated to the specified speed or predetermined G value. According to Condition E, the Y-axis is 30,00g.The purpose is to use the centrifugal force to show the bad structure of parts, such as bad wiring or bad sealing, which can be detected by electrical test and sealing test (including coarse leak test, fine leak test)
4. Seal Test
According to MIL-STD-883, Method 1014, seal test includes coarse leak test, fine leak test, poor seal is easily affected by environmental debris (kahalumigmigan, alikabok, salt, acid, alkali, atbp.).Kaya nga, the defective parts can be detected by sealing test. Both the coarse leak test and the fine leak test shall be performed according to the regulations. If there is no special regulation, the coarse leak test shall be performed first and then the fine leak test shall be performed.
5. Burn-in Test
According to MIL-STD-883,Method 1015(IC class) and MIL-STD-750,Method 1038(diode class)MIL-STD-750,Method1039(transistor class), the temperature and time of the parts to perform prefiring are specified, and MIL-M-38510 and MIL-S-19500 to specify the pre-firing circuit, applied bias, signal frequency range, and amplitude of the individual parts..
6. High and low temperature test
After the pre-burning test, the parts shall be tested for electrical function at the specified total operating temperature.
Electrical performance tests are divided into the following items:
An Incoming Accept Test for parts includes visual appearance and performance tests.
To order parts for environmental testing, identify model number, date of manufacture, name of manufacture, quality level.And the implementation of visual inspection of appearance, where there are damaged defects and not performance test.Normal temperature performance test shall be conducted for those who pass visual inspection.Environmental testing is performed after the performance test passes.
Pre-Burn-in Electric Test
After performing stable baking, temperature cycle, accelerated centrifugation, sealing test and other ring test items, perform normal temperature performance test before pre-burning, and mark qualified products appropriately. In this test, the defective parts in such ring test items as unstable baking, temperature cycle, accelerated centrifugation and sealing test are eliminated.
Pro-Burn-in Electric Test
Performance test shall be performed within 96 hours after cooling for 1 sa 2 hours after pre-burning to eliminate defective parts.
1. The temperature of the neutral salt spray test chamber (NSS) is required to be at (35±2)°C, the humidity is greater than 95%, and the amount of fog reduction is 1~2mL/80cm*h. The nozzle pressure is 78.5~137.3kPa(0.8~1.4 KGF /cm2).In the salt spray test chamber, the salt water containing (5 ~ 0.5)% sodium chloride and pH value of 6.5~7.2 is sprayed through the spray device, so that the salt spray settlement to the test piece to be tested, after a certain time to observe the corrosion state of its surface.
2.copper accelerated acetate salt spray test (CASS) ay upang magdagdag 2 tubig tanso klorido sa 5% sodium chloride salt water batay sa pangkalahatang salt spray test, upang ang konsentrasyon nito ay 0.26g/L, at pagkatapos ay ang acetic acid ay ginagamit upang ayusin ang pH, upang ang halaga ng pH ng solusyon sa koleksyon ng spray ng asin ay 3.1-3.3.(Ang pagsubok ay tumutukoy sa GB/T 10125 pagsubok ng kaagnasan ng kapaligiran na gawa ng tao)
3. Ang alternating salt spray test ay isang komprehensibong salt spray test (alternating salt spray test chamber upang makamit.
Pagsubok ng acetate spray (Pagsusulit sa ASS) ay binuo batay sa neutral salt spray test.Ito ay isang 5% sodium chloride solution na may ilang glacial acetic acid.
Paraan ng operasyon ng salt spray test chamber
1. I-install ang mga panloob na bahagi ng salt spray test chamber: aparato ng spray ng tower, funnel, bilog na bar, V-shaped sample rack, atbp.
2. Ikonekta ang pinagmumulan ng hangin, i-on ang power switch pagkatapos maikonekta ang power.
3. Magdagdag ng tubig sa pressure barrel at sa kahon. Itigil ang pagdaragdag ng tubig pagkatapos patayin ang dalawang lamp na mababa ang tubig. Magdagdag ng tubig sa sealing groove para sa sealing.
4, ang purong tubig at sodium chloride salt na may ratio na 1:20.Ibuhos ang inihandang solusyon sa pasukan ng pagsubok (patayin ang ilaw na may mababang brine).
5. Matapos ang lahat ng mga ilaw, maaari nating i-on ang operasyon, spray at timing switch, at i-on ang defogging switch pagkatapos ng pagsubok.
6. Ayon sa mga kinakailangan sa pagsusulit, ang kagamitan ay maaaring i-spray ng tuluy-tuloy at pana-panahon (Ang mga talahanayan ng T1 at T2 ay handa na 0 para sa tuluy-tuloy na pag-spray; Ang T1 ay ang oras ng pagtatrabaho at ang T2 ay ang oras ng pahinga para sa pasulput-sulpot na pag-spray).
Mga pag-iingat para sa salt spray test chamber
1, regular na paglilinis at pagpapanatili ng salt spray test chamber pressure barrel, tangke ng tubig na may asin, nguso ng gripo.
2. Huwag ibuhos ang sodium chloride solution mula sa pressure barrel sa pamamagitan ng manu-manong pagdaragdag ng tubig. Linisin muna ang solusyon sa pagsukat ng silindro at pagkatapos ay magdagdag ng distilled water.
3. Huwag barado ang likod na tambutso sa panahon ng pagsubok, para hindi ma-deform ang box body dahil sa sobrang pressure sa box body.
4. Ang mga bagay na nasusunog at sumasabog ay hindi dapat ilagay sa kahon.
5. Ang pressure gauge sa likod ng salt spray test box ay 2kg at ang harap ay 1kg. Ito ay dinisenyo ng Dongguan Zhengtai Test Instrument Co., Ltd. bago ito umalis sa pabrika, at mangyaring huwag gumalaw.
6. Kung ang dami ng spray ay hindi sapat, pakitaasan ang spray tower. Kung ang dami ng spray ay masyadong malaki, ibaba ang spray tower (ang pamantayan para sa pagkolekta ng dami ng spray ay 1~2ml/h, at ang average na halaga ng 16 oras)